Merchandise Description
RV collection Characteristics
- RV – Dimensions:030-040-050-063-075-one hundred and five-a hundred and ten-one hundred thirty-a hundred and fifty
- Input Choices: with input shaft, With Square flange,With Enter Flange
- Input CZPT .06 to 11 kW
- RV-Measurement from 030 to 105 in die-cast aluminium alloy budy and more than one hundred ten in forged iron
- Ratios between 5 and one hundred
- Max torque 1550 N.m and admissible output radial hundreds max 8771 N
- Aluminium models are supplied comprehensive with synthetic oil and let for CZPT mounting positions, with no want to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
- Size 030 and in excess of are painted with RAL 5571 blue
- Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Possibilities: torque arm, output flange, viton oil seals, lower/high temperature oil, filling/drain/breather/amount plug,Little gap
Simple models can be applied to a extensive variety of CZPT reduction ratios from 5 to one thousand.
Warranty: One year from day of shipping and delivery.
WORM GEARBOX | |||||
SNW SERIES | Output CZPT Range: | ||||
Type | Previous Variety | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant CZPT CZPT : | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Input Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC CZPT | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Input Flange |
Starshine CZPT
ZheJiang CZPT glow CZPT Co.,Ltd,the predecessor was a condition-owned army mould business, was proven in 1965. CZPT shine specializes in the full CZPT transmission solution for substantial-conclude equipment production industries primarily based on the purpose of “System Solution, Software Layout and Professional Provider”.
Starshine have a robust specialized power with more than 350 employees at current, including in excess of thirty CZPT professionals, 30 high quality inspectors, masking an location of 80000 sq. meters and types of CZPT d processing equipment and tests equipments. We have a good basis for the industry software improvement and services of large-stop pace reducers & variators owning to the provincial CZPT technologies study middle,the lab of gear pace reducers, and the foundation of modern R&D.
Our Crew
Quality Control
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Shipping